Shingle up to the area that requires the smartvent roof to wall vent application.
Roof to wall.
6 six 4 foot pcs.
Yes even flat roof to wall intersections are not being properly done.
Tape over the cut in the housewrap with housewrap tape.
Ensure there is proper continuous intake ventilation below proposed roof to wall ventilation.
While stopping rain and snow at the point entry thanks to the enhanced snow screen.
The flat roofing material must go up the wall a minimum of 12 or up the wall and over the top of the wall if the wall is less than 12 high.
Wide roll of aluminum flashing.
Of net free vent area per lin.
4 r2w end plugs.
A bag of 2 roofing nails.
It is designed to cover and protect roof to wall intersections from water infiltration.
Now install the kickout flashing and step flashings up the roof as needed.
The gibraltar roof to wall flashing is made from trusted 28 gauge galvanized steel.
That lip is then set into a reglet or groove in this case cut into the mortar joint of the brick wall above.
Shed roof ventilation instructions.
The wall leg of the kickout should be applied over the housewrap cut a 2 ft square piece of housewrap and tuck one edge into the horizontal cut the same one the first piece of housewrap was slipped into and up under the housewrap on the wall by at least 5 in.
Ft that provide 6 75 sq.
Roof to wall flashing is bent at a 110.
Step 2 measure 3 out from the wall where the smartvent will bend up on the wall.
Of roof to wall vent 24 lin.
Of net free vent area per lin.